How to Prepare for Your First Power Platform Project

Solvency Studio · 6 min read

You do not need a finished technical specification to begin a Power Platform project.

You do need a clear picture of the work you want to improve, the people involved, and the result that would make the project worthwhile.

That preparation helps turn a broad request such as “we need an app” or “we want to automate this” into a manageable piece of work. It also gives the person helping you enough context to ask useful questions before recommending a solution.

The best starting materials are often already available: the form people use, the spreadsheet they update, the emails they send, and a few examples of where the process breaks down.

Start with one business problem

Choose a problem you can describe without naming a product.

For example: “We cannot tell who owns an open request,” or “Someone spends hours copying information into the monthly report.” Those descriptions give the project a practical purpose.

Identify the business problem, understand the current process, and establish the project objectives before deciding whether the answer involves an app, an automated workflow, a report, or an improvement to an existing tool.

Keep the first problem narrow enough to explain and test. Replacing every spreadsheet or connecting every system at once can make it difficult to agree on what the first release must achieve.

Begin with a specific improvement the team will recognize.

Show how the work happens today

Write down the main steps from the moment the work begins to the point it is complete. Include who handles each step and where the information goes.

Then walk through a real example with someone who does the work regularly. The written procedure may leave out the copying, checking, reminders, and workarounds that keep things moving.

Gather a few representative materials:

  • the current form, tracker, or report;
  • an example of a normal request;
  • an example that needed correction or special handling;
  • the messages people use to hand work over;
  • and any rules that determine who acts next.

Use sanitized examples where the original material contains sensitive information. The goal is to explain the structure and the work, not to share more data than the project needs.

Define what better would look like

Agree on a few outcomes that would make a difference to the team.

You might want each request to have a visible owner, information to be entered once, or a report to require less preparation. Avoid making speed the only measure if accuracy or accountability is the larger problem.

Record a starting point where you can. That might be the time spent preparing a report, the number of requests needing follow-up, or the effort involved in finding the latest status.

Those observations help you evaluate the result later. They also make it easier to choose between a useful first release and features that can wait.

Describe success in terms of the work people will do differently.

Identify the people who need to be involved

A project needs more than someone who can build the solution.

Identify the person who owns the business process and can decide how it should work. Include people who perform the everyday tasks, because they can explain the details that are easy to miss in a planning meeting.

You may also need someone who manages Microsoft access, licenses, and environments, along with the owners of any systems or data the solution will use.

Clarify who can approve the scope, answer questions during the build, and decide whether the finished result is ready for use. Slow or conflicting decisions can hold up a project even when the technical work is straightforward.

Name a future support owner early. The solution will need someone to manage questions, failures, access changes, and updates after the initial build.

Understand the information the solution needs

List the information people collect and use. Where does it live? Who maintains it? Which record should be trusted when two sources disagree?

Look for missing values, duplicate records, and inconsistent categories. These issues do not have to be completely resolved before the first conversation, but they should be visible in the plan.

Also identify who should be able to view or change the information. An employee submitting a request may need different access from the person managing the whole queue.

If another business system is involved, bring its name, its owner, and the specific action you want the connection to support. “Create a job after approval” is a clearer requirement than simply “integrate the systems.”

Check access and licensing before making assumptions

Make a list of the Microsoft services and other tools the organization already uses. Ask the administrator to help confirm what is available and what the proposed solution would require.

Access to one Microsoft product does not establish the licensing needs of every app, flow, connection, or user in a future solution. Confirm the requirements of the actual design before relying on a cost assumption.

Separate learning and development from live business use. Microsoft's Power Apps Developer Plan is intended for development and testing, not production use. [1] A successful prototype does not, by itself, establish that the live deployment is ready or appropriately licensed.

Agree on a manageable first release

Separate the essentials from ideas that would be useful later.

For a request process, the first release might include submission, assignment, status tracking, and a clear outcome. A broader reporting suite or additional integrations could be considered after that process works reliably.

Discuss the available budget, the desired timing, and any dates that are genuinely fixed. Be clear about whether the first milestone is a demonstration, a pilot, or a solution ready for everyday use.

Write down what is outside the initial scope, too. That gives everyone a shared basis for discussing new requests and their effect on the schedule or cost.

A focused first release gives the team something concrete to test and improve.

Plan for testing, handover, and everyday use

Decide how the team will check the result before depending on it.

Prepare examples of the normal process and the situations that need special handling: missing information, rejected requests, unavailable approvers, duplicate submissions, or an update that fails.

Agree on what users should see, what records should change, and who should be notified. Those expectations become practical acceptance checks for the build.

The handover should include instructions, ownership, known limitations, and a way to report problems. Plan how existing work will move into the new process and how the team will manage the transition.

Training and support deserve a place in the project plan. A solution is more likely to be useful when people understand how it fits their work and where to get help.

Prepare for the day after launch as well as the demonstration.


Before your first project conversation

Bring or confirm:

  • one clear business problem and the people affected by it;
  • a walkthrough of the current process and representative examples;
  • the outcomes that would make the project worthwhile;
  • the process owner, decision makers, and future support owner;
  • the data sources, access needs, and systems involved;
  • the available budget, timing, and priorities for a first release;
  • and the people and examples needed for testing and handover.

You do not need all the technical answers. Bring enough context to make the next decisions clear, and identify the questions the project needs to resolve.